A Think Again Media Group publication
Wrong the Whole Time

The London crossing that changed continents

Rennie's London Bridge: a crossing with more than one past

By Phil Springer, Editor · Published · Wrong the Whole Time

Rennie's London Bridge: a crossing with more than one past

Rennie's London Bridge was the crossing sold to Robert P. McCulloch in 1968 and rebuilt at Lake Havasu City in Arizona. It had opened across the Thames in 1831. The medieval bridge that preceded it belonged to a different structure and had already been demolished by 1832. A continuing name links successive crossings, but the dates separate the particular bridge that changed continents from the much older one lined with buildings.

London Museum's historical account traces a crossing near the site to Roman Londinium around 47 CE. Later versions used timber and suffered repeated damage. A storm in 1091 was among the events that required rebuilding. The first stone bridge was completed in 1209, with fortified gates, towers and a drawbridge. That structure endured for about 600 years. Its long use did not mean an unchanged fabric: repairs, damage and replacement of components formed part of its history.

The medieval crossing also supported a community and an income stream. A boundary stone dated 1509 in London Museum's collection bears the wardens' mark and a dated inscription. Its catalogue records that the bridge supported 138 houses and shops by 1358. Rents helped maintain the structure. Other income came from tolls on carts crossing it and vessels passing beneath, together with fines for unlawful fishing. By the 1400s, the Bridge Trust administered an organization employing tradesmen, cooks, tidesmen and gardeners. Its holdings included more than 800 properties, extending into districts including Peckham, Lewisham and Sydenham. The institution's finances connected a crowded river crossing with a wider urban estate.

By the 1800s, houses had been removed and the roadway widened, but congestion and maintenance remained problems. London Museum identifies John Rennie's design for a wider bridge with stone arches as the replacement. Construction beside the old crossing allowed the two to coexist while work progressed. The museum reproduces Gideon Yates's view of the old bridge alongside the new bridge under construction in June 1828. That image preserves a transition between two structures sharing a name. Completion of the replacement preceded the final demolition of its medieval neighbor.

A bronze medal supplies a compact contemporary record of the new undertaking. London Museum attributes it to B. Wyon and dates it to 1831. One face carries the arms, crest and motto of the City of London. The other displays the Bridge House Estates mark within an oak wreath. Its inscription dates commencement to June 15, 1825, and opening to August 1, 1831. The catalogue records that William IV and Queen Adelaide opened the bridge. The catalogue identifies Bridge House Estates as a charity established in 1282 to maintain the crossing through tolls and donations. It also records that the access roads for the new bridge cost more than the bridge itself. It measures only 27 millimeters across, yet preserves both construction and ceremonial dates.

The opening also survives in a contemporary account reproduced by John Ashton in When William IV. was King, published in 1896. Ashton explicitly identifies the Annual Register as his source. In that account, the royal party traveled from Somerset House by water, with crowds along the river and ceremonial barges surrounding them. A pavilion and awnings had been erected at the bridge, and crimson cloth covered the stairs on the London side. The king received a gold commemorative medal, bearing his head on one side and a view of the bridge on the other. During the procession across and back, the royal party threw medals to spectators. The account also describes a balloon ascent timed to the royal procession's arrival on the Surrey side of the bridge. Ashton also records that the bridge opened to the public the following day, when an estimated 200,000 people crossed from the London side.

Rennie's London Bridge continued to generate images during its working life. William Lionel Wyllie's 1925 print, held by Royal Museums Greenwich, looks from its northwestern corner toward Southwark Cathedral. A rowing boat and a lighter pass below, with gulls in flight and along the riverside. The museum catalogues the work as drypoint and aquatint. Its interpretation suggests that Wyllie's viewpoint involved leaning over the Thames path.

Royal Museums Greenwich records that the structure had been completed by Rennie's son, also named John, about 100 feet west of the medieval crossing. It was widened in 1902–1904 as traffic increased, but its foundations were found to be sinking. The 1968 sale sent Rennie's London Bridge to Arizona. A replacement crossing in London opened in 1973. The bronze medal's catalogue likewise connects the 1831 bridge with McCulloch's reconstruction over the Bridgewater Channel at Lake Havasu City.

True or False?

The London Bridge rebuilt in Arizona was the medieval bridge completed in 1209.

Show the answer

The Record

False. The bridge sold to Robert P. McCulloch in 1968 was John Rennie's crossing, opened in 1831; the medieval bridge had been demolished by 1832.

Send this question to a friend

Read next

By clicking “Send me the real story” you agree to Wrong the Whole Time’s Terms of Use and Privacy Policy.